Jinlang Chemical — Metal’s Trusted Shield

Metal protective coatings

FluShld D316 Fluorocarbon Topcoat

For above-ground projects where a fluorocarbon finish is being specified.

FluShld D316 · Finish layer

FluShld D316: Finish coat. Product-role illustration only; no substrate or compatible layer arrangement asserted.Listed product roleFinish coat

Key specifications

Product roleTopcoat
ChemistryTwo-component ambient-curing fluoropolymer coating; resin identity follows the product-specific resin declaration.
ComponentsTwo components (2K)
Dry film thickness25–40 µm per coat.
Theoretical coverage15.0–24.0 m²/L at the stated DFT, before thinning and site losses.
Mix ratio A:B10:1 by weight
ColourStandard / RAL on request
FinishMatt / project adjustable, typical 10–30 GU at 60°
Volume solids60.0% by volume (58.0%–62.0%)
Mass solids≥75.0% by weight
Density1.380 kg/L at 25 °C, mixed A+B before thinning
Additional engineering and product references
VOC content
<420 g/L
Wet film thickness
42–67 µm per coat before thinning.

TDS & SDS

TDS Technical data sheet

A Component SDS

B Component SDS

Coating system

Describe the substrate, exposure and underlying coats; do not specify from this listing for immersion, buried service or splash zones.

  • Not for immersion, buried service or splash-zone exposure. Confirm finish thickness with the underlying coating build.

What the steel topcoat does

For structural steel: compare atmospheric exposure categories C1–C5

Substrate preparation

Identify the specified underlying coat. Confirm it is clean, sound and ready for recoating under the applicable instructions. Other substrates or an unidentified coating need project-specific confirmation.

For structural steel, use these checks:

Application reference

FluShld D316 application values
Application methodConventional pressure-pot air spray, brush or short-nap roller.
Application temperature5–35 °C
Relative humidity≤85%
Mix ratio A:B10:1 by weight
Pot lifeEngineering working time: maximum 1 h at 25 °C, counted from first A+B contact. Apply promptly after mixing. Discard material at the stated time or on loss of application properties, whichever occurs first.
Touch dry≤2 h at 25 °C
Hard dry24 h at 25 °C
Recoat interval24 h–7 days at 25 °C. After 7 days, clean and abrade before recoating.
Full cure7 days at 25 °C
ThinnerFluThi 10
Thinning referenceUse FluThi 10 at 5% by volume of mixed A+B for the specified spray or roller application; maximum 5%. Add within 30 min of first A+B contact. Thinner supply density: ≤1.00 kg/L at 25 °C.

Packaging & ordering

FluShld D316 packaging options
PackagingUse the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label.
Matched component setA 20 kg + B 2 kg / 22 kg set
Shelf life12 months

Include the quantity, delivery country and colour reference in your enquiry.

LET’S TALK MATERIALS

Your project.
A clearer next step.

Tell us what you know. Leave the technical unknowns to the conversation.

JavaScript is required to send your enquiry.

Your enquiry details
Choose a RAL Colour opens the colour guide in this tab. When browsing options with arrow keys, press Enter to confirm.Choose a RAL Colour

For kg-based products, leave Package blank and enter the number of sets in Quantity.

Compare metal protective coatingsPrepare your project enquiryUnderstand TDS and SDS