Metal protective coatings
FluShld D316 Fluorocarbon Topcoat
For above-ground projects where a fluorocarbon finish is being specified.
FluShld D316 · Finish layer
Key specifications
| Product role | Topcoat |
|---|---|
| Chemistry | Two-component ambient-curing fluoropolymer coating; resin identity follows the product-specific resin declaration. |
| Components | Two components (2K) |
| Dry film thickness | 25–40 µm per coat. |
| Theoretical coverage | 15.0–24.0 m²/L at the stated DFT, before thinning and site losses. |
| Mix ratio A:B | 10:1 by weight |
| Colour | Standard / RAL on request |
| Finish | Matt / project adjustable, typical 10–30 GU at 60° |
| Volume solids | 60.0% by volume (58.0%–62.0%) |
| Mass solids | ≥75.0% by weight |
| Density | 1.380 kg/L at 25 °C, mixed A+B before thinning |
Additional engineering and product references
- VOC content
- <420 g/L
- Wet film thickness
- 42–67 µm per coat before thinning.
TDS & SDS
TDS Technical data sheet
A Component SDS
B Component SDS
Coating system
Describe the substrate, exposure and underlying coats; do not specify from this listing for immersion, buried service or splash zones.
- Not for immersion, buried service or splash-zone exposure. Confirm finish thickness with the underlying coating build.
For structural steel: compare atmospheric exposure categories C1–C5
Substrate preparation
Identify the specified underlying coat. Confirm it is clean, sound and ready for recoating under the applicable instructions. Other substrates or an unidentified coating need project-specific confirmation.
For structural steel, use these checks:
Application reference
| Application method | Conventional pressure-pot air spray, brush or short-nap roller. |
|---|---|
| Application temperature | 5–35 °C |
| Relative humidity | ≤85% |
| Mix ratio A:B | 10:1 by weight |
| Pot life | Engineering working time: maximum 1 h at 25 °C, counted from first A+B contact. Apply promptly after mixing. Discard material at the stated time or on loss of application properties, whichever occurs first. |
| Touch dry | ≤2 h at 25 °C |
| Hard dry | 24 h at 25 °C |
| Recoat interval | 24 h–7 days at 25 °C. After 7 days, clean and abrade before recoating. |
| Full cure | 7 days at 25 °C |
| Thinner | FluThi 10 |
| Thinning reference | Use FluThi 10 at 5% by volume of mixed A+B for the specified spray or roller application; maximum 5%. Add within 30 min of first A+B contact. Thinner supply density: ≤1.00 kg/L at 25 °C. |
Packaging & ordering
| Packaging | Use the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label. |
|---|---|
| Matched component set | A 20 kg + B 2 kg / 22 kg set |
| Shelf life | 12 months |
Include the quantity, delivery country and colour reference in your enquiry.
LET’S TALK MATERIALS
Your project.
A clearer next step.
Tell us what you know. Leave the technical unknowns to the conversation.
JavaScript is required to send your enquiry.
