Jinlang Chemical — Metal’s Trusted Shield

Metal protective coatings

EpoPri D28-80 Zinc-Rich Epoxy Primer

Zinc-rich epoxy primer for prepared steel.

EpoPri D28-80 · Primer layer

Finish coatIntermediate coatEpoPri D28-80PrimerPrepared steel plate
  • Finish coat
  • Intermediate coat
  • EpoPri D28-80 · Primer
  • Prepared steel plate

Key specifications

Product roleZinc-rich epoxy primer
ChemistryZinc-rich epoxy
Zinc content in dry film80%
ComponentsTwo components (2K)
Dry film thickness60–80 µm per coat.
Theoretical coverage8.5–11.3 m²/L at the stated DFT, before thinning and site losses.
Mix ratio A:B10:1 by weight
ColourZinc grey
Volume solids68.0% by volume (66.0%–70.0%)
Mass solids90.0% by weight (88.0%–92.0%)
Density3.170 kg/L at 25 °C, mixed A+B before thinning
Additional engineering and product references
VOC content
<420 g/L
Wet film thickness
88–118 µm per coat before thinning.
Metallic zinc in dry film
80% by weight (owner-declared; laboratory verification is not provided).

TDS & SDS

TDS Technical data sheet

A Component SDS

B Component SDS

Coating system

  • Control film thickness and confirm how to remove any zinc salts or surface contamination before overcoating.

What a steel primer does

For structural steel: compare atmospheric exposure categories C1–C5

Substrate preparation

Identify the substrate and whether it is bare, shop-primed or previously coated. Record rust, contamination and the condition of any existing paint. Confirm the preparation for this primer and the specified substrate before application.

For structural steel, use these checks:

Application reference

EpoPri D28-80 application values
Application methodAirless spray / conventional spray
Application temperature5–35 °C
Relative humidity≤85%
Mix ratio A:B10:1 by weight
Pot lifeEngineering working time: maximum 6 h at 25 °C, counted from first A+B contact and including the 30 min induction period. Maintain slow agitation during use.
Touch dry≤3 h at 25 °C
Hard dry8 h at 25 °C
Recoat interval8 h–7 days at 25 °C; after maximum, clean and abrade before recoating.
Full cure7 days at 25 °C
ThinnerEpoThi 10
Thinning referenceUse EpoThi 10, 0–2% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C.

Packaging & ordering

EpoPri D28-80 packaging options
PackagingUse the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label.
Matched component setA 20 kg + B 2 kg / 22 kg set
Shelf life12 months

Include the quantity, delivery country and colour reference in your enquiry.

LET’S TALK MATERIALS

Your project.
A clearer next step.

Tell us what you know. Leave the technical unknowns to the conversation.

JavaScript is required to send your enquiry.

Your enquiry details
Choose a RAL Colour opens the colour guide in this tab. When browsing options with arrow keys, press Enter to confirm.Choose a RAL Colour

For kg-based products, leave Package blank and enter the number of sets in Quantity.

Compare metal protective coatingsPrepare your project enquiryUnderstand TDS and SDS