Metal protective coatings
EpoPri D27E Economy General-Purpose Anticorrosive Primer
For steelwork enquiries where an epoxy primer is being specified.
EpoPri D27E · Primer layer
Key specifications
| Product role | Anticorrosive primer |
|---|---|
| Chemistry | Epoxy |
| Components | Two components (2K) |
| Dry film thickness | 50–80 µm per coat. |
| Theoretical coverage | 8.5–13.6 m²/L at the stated DFT, before thinning and site losses. |
| Mix ratio A:B | 9:1 by weight |
| Colour | Standard / RAL on request |
| Volume solids | 68.0% by volume (66.0%–70.0%) |
| Mass solids | 81.0% by weight (79.0%–83.0%) |
| Density | 1.450 kg/L at 25 °C, mixed A+B before thinning |
Additional engineering and product references
- VOC content
- <420 g/L
- Wet film thickness
- 74–118 µm per coat before thinning.
TDS & SDS
TDS Technical data sheet
A Component SDS
B Component SDS
Coating system
Use the full EpoPri D27E name; EpoMor D27E is a separate catalogue entry. Confirm the component set and preparation; zinc-rich status is not established.
- Confirm the surface preparation grade, profile and next coat. The epoxy identity does not establish zinc-rich status or validate older application values.
For structural steel: compare atmospheric exposure categories C1–C5
Substrate preparation
Identify the substrate and whether it is bare, shop-primed or previously coated. Record rust, contamination and the condition of any existing paint. Confirm the preparation for this primer and the specified substrate before application.
For structural steel, use these checks:
Application reference
| Application method | Brush / roller / spray |
|---|---|
| Application temperature | 10–30 °C |
| Relative humidity | ≤80% |
| Mix ratio A:B | 9:1 by weight |
| Pot life | Engineering working time: maximum 4 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first. |
| Touch dry | ≤1 h at 25 °C |
| Hard dry | 4 h at 25 °C |
| Recoat interval | 6 h–72 h at 25 °C; after maximum, clean and abrade before recoating. |
| Full cure | 7 days at 25 °C |
| Thinner | EpoThi 20 |
| Thinning reference | Use EpoThi 20, 0–10% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C. |
Packaging & ordering
| Packaging | Use the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label. |
|---|---|
| Matched component set | A 18 kg + B 2 kg / 20 kg set |
| Shelf life | 12 months |
Include the quantity, delivery country and colour reference in your enquiry.
LET’S TALK MATERIALS
Your project.
A clearer next step.
Tell us what you know. Leave the technical unknowns to the conversation.
JavaScript is required to send your enquiry.
