Jinlang Chemical — Metal’s Trusted Shield

Metal protective coatings

EpoPri D27E Economy General-Purpose Anticorrosive Primer

For steelwork enquiries where an epoxy primer is being specified.

EpoPri D27E · Primer layer

EpoPri D27E: Primer. Product-role illustration only; no substrate or compatible layer arrangement asserted.Listed product rolePrimer

Key specifications

Product roleAnticorrosive primer
ChemistryEpoxy
ComponentsTwo components (2K)
Dry film thickness50–80 µm per coat.
Theoretical coverage8.5–13.6 m²/L at the stated DFT, before thinning and site losses.
Mix ratio A:B9:1 by weight
ColourStandard / RAL on request
Volume solids68.0% by volume (66.0%–70.0%)
Mass solids81.0% by weight (79.0%–83.0%)
Density1.450 kg/L at 25 °C, mixed A+B before thinning
Additional engineering and product references
VOC content
<420 g/L
Wet film thickness
74–118 µm per coat before thinning.

TDS & SDS

TDS Technical data sheet

A Component SDS

B Component SDS

Coating system

Use the full EpoPri D27E name; EpoMor D27E is a separate catalogue entry. Confirm the component set and preparation; zinc-rich status is not established.

  • Confirm the surface preparation grade, profile and next coat. The epoxy identity does not establish zinc-rich status or validate older application values.

What a steel primer does

For structural steel: compare atmospheric exposure categories C1–C5

Substrate preparation

Identify the substrate and whether it is bare, shop-primed or previously coated. Record rust, contamination and the condition of any existing paint. Confirm the preparation for this primer and the specified substrate before application.

For structural steel, use these checks:

Application reference

EpoPri D27E application values
Application methodBrush / roller / spray
Application temperature10–30 °C
Relative humidity≤80%
Mix ratio A:B9:1 by weight
Pot lifeEngineering working time: maximum 4 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first.
Touch dry≤1 h at 25 °C
Hard dry4 h at 25 °C
Recoat interval6 h–72 h at 25 °C; after maximum, clean and abrade before recoating.
Full cure7 days at 25 °C
ThinnerEpoThi 20
Thinning referenceUse EpoThi 20, 0–10% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C.

Packaging & ordering

EpoPri D27E packaging options
PackagingUse the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label.
Matched component setA 18 kg + B 2 kg / 20 kg set
Shelf life12 months

Include the quantity, delivery country and colour reference in your enquiry.

LET’S TALK MATERIALS

Your project.
A clearer next step.

Tell us what you know. Leave the technical unknowns to the conversation.

JavaScript is required to send your enquiry.

Your enquiry details
Choose a RAL Colour opens the colour guide in this tab. When browsing options with arrow keys, press Enter to confirm.Choose a RAL Colour

For kg-based products, leave Package blank and enter the number of sets in Quantity.

Compare metal protective coatingsPrepare your project enquiryUnderstand TDS and SDS