Metal protective coatings
EpoPri D24 High-Build Glass Flake Epoxy Barrier Primer
For industrial steel coating enquiries that specify a barrier layer.
EpoPri D24 · Primer layer
- Finish coat
- Intermediate coat
- EpoPri D24 · Primer
- Prepared steel plate
Key specifications
| Product role | Glass-flake barrier primer |
|---|---|
| Chemistry | Glass-flake epoxy |
| Components | Two components (2K) |
| Dry film thickness | 100–200 µm per coat. |
| Theoretical coverage | 4.2–8.3 m²/L at the stated DFT, before thinning and site losses. |
| Mix ratio A:B | 8:1 by weight |
| Colour | Standard / RAL on request |
| Volume solids | 83.0% by volume (79.0%–87.0%) |
| Mass solids | 85.0% by weight (83.0%–87.0%) |
| Density | 1.520 kg/L at 25 °C, mixed A+B before thinning |
Additional engineering and product references
- VOC content
- <420 g/L
- Wet film thickness
- 120–241 µm per coat before thinning.
TDS & SDS
TDS Technical data sheet
A Component SDS
B Component SDS
Coating system
Use the full EpoPri D24 name. Confirm whether the project needs a primer or a separate intermediate layer, and describe exposure.
- For high film build, confirm sag control and the permitted interval before the next coat. EpoMor D24 is a different product.
For structural steel: compare atmospheric exposure categories C1–C5
Substrate preparation
Identify the substrate and whether it is bare, shop-primed or previously coated. Record rust, contamination and the condition of any existing paint. Confirm the preparation for this primer and the specified substrate before application.
For structural steel, use these checks:
Application reference
| Application method | Mainly airless spray |
|---|---|
| Application temperature | 5–35 °C |
| Relative humidity | ≤85% |
| Mix ratio A:B | 8:1 by weight |
| Pot life | Engineering working time: maximum 0.75 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first. |
| Touch dry | ≤7 h at 25 °C |
| Hard dry | 24 h at 25 °C |
| Recoat interval | 24 h–7 days at 25 °C; after maximum, clean and abrade before recoating. |
| Full cure | 7 days at 25 °C |
| Thinner | EpoThi 10 |
| Thinning reference | Use EpoThi 10, 0–5% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C. |
Packaging & ordering
| Packaging | Use the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label. |
|---|---|
| Matched component set | A 16 kg + B 2 kg / 18 kg set |
| Shelf life | 12 months |
Include the quantity, delivery country and colour reference in your enquiry.