Jinlang Chemical — Metal’s Trusted Shield

Metal protective coatings

AcUrShld D215 High-Build Acrylic Polyurethane Topcoat

For steelwork or outdoor equipment enquiries seeking a high-build finishing option.

AcUrShld D215 · Finish layer

AcUrShld D215Finish coatIntermediate coatPrimerPrepared steel plate
  • AcUrShld D215 · Finish coat
  • Intermediate coat
  • Primer
  • Prepared steel plate

Key specifications

Product roleHigh-build topcoat
ChemistryAcrylic polyurethane
ComponentsTwo components (2K)
Dry film thickness70–100 µm per coat.
Theoretical coverage6.5–9.3 m²/L at the stated DFT, before thinning and site losses.
Mix ratio A:B4:1 by weight
ColourStandard / RAL on request
FinishGloss ≥80 GU at 60°
Volume solids65.0% by volume (63.0%–67.0%)
Mass solids78.0% by weight (76.0%–80.0%)
Density1.340 kg/L at 25 °C, mixed A+B before thinning
Additional engineering and product references
VOC content
<420 g/L
Wet film thickness
108–154 µm per coat before thinning.

TDS & SDS

TDS Technical data sheet

A Component SDS

B Component SDS

Coating system

State target film build and the coats below, and confirm the actual application requirements.

  • Confirm sag control, drying and final appearance at the intended film thickness.

What the steel topcoat does

For structural steel: compare atmospheric exposure categories C1–C5

Substrate preparation

Identify the specified underlying coat. Confirm it is clean, sound and ready for recoating under the applicable instructions. Other substrates or an unidentified coating need project-specific confirmation.

For structural steel, use these checks:

Application reference

AcUrShld D215 application values
Application methodAirless / conventional spray
Application temperature5–35 °C
Relative humidity≤85%
Mix ratio A:B4:1 by weight
Pot lifeEngineering working time: maximum 2 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first.
Touch dry1 h at 25 °C and 50% RH under the adopted engineering application condition.
Dry to handleAllow 9 h at 25 °C and 50% RH before handling.
Recoat interval8–72 h at 25 °C and 50% RH; clean and abrade after the maximum.
Full cure7 days at 25 °C and 50% RH.
ThinnerUreThi 10
Thinning referenceUse UreThi 10, 0–10% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C.

Packaging & ordering

AcUrShld D215 packaging options
PackagingUse the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label.
Matched component setA 16 kg + B 4 kg / 20 kg set
Shelf life12 months

Include the quantity, delivery country and colour reference in your enquiry.

LET’S TALK MATERIALS

Your project.
A clearer next step.

Tell us what you know. Leave the technical unknowns to the conversation.

JavaScript is required to send your enquiry.

Your enquiry details
Choose a RAL Colour opens the colour guide in this tab. When browsing options with arrow keys, press Enter to confirm.Choose a RAL Colour

For kg-based products, leave Package blank and enter the number of sets in Quantity.

Compare metal protective coatingsPrepare your project enquiryUnderstand TDS and SDS