Metal protective coatings
AcUrShld D213 Aliphatic Acrylic Polyurethane Topcoat
For outdoor steel or equipment enquiries where a polyurethane finish is specified.
AcUrShld D213 · Finish layer
- AcUrShld D213 · Finish coat
- Intermediate coat
- Primer
- Prepared steel plate
Key specifications
| Product role | Topcoat |
|---|---|
| Chemistry | Aliphatic acrylic polyurethane |
| Components | Two components (2K) |
| Dry film thickness | 30–50 µm per coat. |
| Theoretical coverage | 13.0–21.7 m²/L at the stated DFT, before thinning and site losses. |
| Mix ratio A:B | 5:1 by weight |
| Colour | Standard / RAL on request |
| Finish | Gloss ≥80 GU at 60° |
| Volume solids | 65.0% by volume (63.0%–67.0%) |
| Mass solids | 78.0% by weight (76.0%–80.0%) |
| Density | 1.340 kg/L at 25 °C, mixed A+B before thinning |
Additional engineering and product references
- VOC content
- <420 g/L
- Wet film thickness
- 46–77 µm per coat before thinning.
TDS & SDS
TDS Technical data sheet
A Component SDS
B Component SDS
Coating system
Send project exposure, colour and appearance requirements, and the proposed layers below the topcoat.
- Confirm exposure and the complete coating build, including the underlying coat and recoating interval.
For structural steel: compare atmospheric exposure categories C1–C5
Substrate preparation
Identify the specified underlying coat. Confirm it is clean, sound and ready for recoating under the applicable instructions. Other substrates or an unidentified coating need project-specific confirmation.
For structural steel, use these checks:
Application reference
| Application method | Mainly spray application |
|---|---|
| Application temperature | 5–35 °C |
| Relative humidity | ≤85% |
| Mix ratio A:B | 5:1 by weight |
| Pot life | Engineering working time: maximum 2 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first. |
| Touch dry | 1 h at 25 °C and 50% RH under the adopted engineering application condition. |
| Dry to handle | Allow 9 h at 25 °C and 50% RH before handling. |
| Recoat interval | 8–72 h at 25 °C and 50% RH; clean and abrade after the maximum. |
| Full cure | 7 days at 25 °C and 50% RH. |
| Thinner | UreThi 10 |
| Thinning reference | Use UreThi 10, 0–10% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C. |
Packaging & ordering
| Packaging | Use the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label. |
|---|---|
| Matched component set | A 20 kg + B 4 kg / 24 kg set |
| Shelf life | 12 months |
Include the quantity, delivery country and colour reference in your enquiry.
LET’S TALK MATERIALS
Your project.
A clearer next step.
Tell us what you know. Leave the technical unknowns to the conversation.
JavaScript is required to send your enquiry.
