Jinlang Chemical — Metal’s Trusted Shield

Metal protective coatings

AcrDTM D212L Zinc Phosphate-Modified Polyurethane Direct-to-Metal Coating

For machinery and equipment enquiries where a direct-to-metal route is being considered.

AcrDTM D212L · Direct-to-metal coating

AcrDTM D212L: Direct-to-metal coating. Product-role illustration only; no substrate or compatible layer arrangement asserted.Listed product roleDirect-to-metal coating

Key specifications

Product roleDirect-to-metal coating
ChemistryZinc phosphate-modified aliphatic polyurethane
ComponentsTwo components (2K)
Dry film thickness60–80 µm per coat.
Theoretical coverage8.1–10.8 m²/L at the stated DFT, before thinning and site losses.
Mix ratio A:B7:1 by weight
ColourStandard / RAL on request
FinishGloss ≥80 GU at 60°
Volume solids65.0% by volume (63.0%–67.0%)
Mass solids78.0% by weight (76.0%–80.0%)
Density1.340 kg/L at 25 °C, mixed A+B before thinning
Additional engineering and product references
VOC content
<420 g/L
Wet film thickness
92–123 µm per coat before thinning.

TDS & SDS

TDS Technical data sheet

A Component SDS

B Component SDS

Coating system

Use the complete AcrDTM D212L model name. Ask for the current formula and confirm preparation and whether a primer is required.

  • Not a substitute for zinc-rich primer where required. Do not assume a single coat is suitable for demanding exposure.

What direct-to-metal means

For structural steel: compare atmospheric exposure categories C1–C5

Substrate preparation

Confirm the exact metal and existing surface condition. Check where direct application is permitted, what preparation is specified, and whether the proposed exposure needs more than one coat or a different build-up.

For structural steel, use these checks:

Application reference

AcrDTM D212L application values
Application methodMainly spray application
Application temperature5–35 °C
Relative humidity≤85%
Mix ratio A:B7:1 by weight
Pot lifeEngineering working time: maximum 2 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first.
Touch dry1 h at 25 °C and 50% RH under the adopted engineering application condition.
Dry to handleAllow 9 h at 25 °C and 50% RH before handling.
Recoat interval8–72 h at 25 °C and 50% RH; clean and abrade after the maximum.
Full cure7 days at 25 °C and 50% RH.
ThinnerUreThi 10
Thinning referenceUse UreThi 10, 0–10% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C.

Packaging & ordering

AcrDTM D212L packaging options
PackagingUse the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label.
Matched component setA 14 kg + B 2 kg / 16 kg set
Shelf life12 months in unopened original containers under the stated storage conditions

Include the quantity, delivery country and colour reference in your enquiry.

LET’S TALK MATERIALS

Your project.
A clearer next step.

Tell us what you know. Leave the technical unknowns to the conversation.

JavaScript is required to send your enquiry.

Your enquiry details
Choose a RAL Colour opens the colour guide in this tab. When browsing options with arrow keys, press Enter to confirm.Choose a RAL Colour

For kg-based products, leave Package blank and enter the number of sets in Quantity.

Compare metal protective coatingsPrepare your project enquiryUnderstand TDS and SDS