Metal protective coatings
AcrDTM D212L Zinc Phosphate-Modified Polyurethane Direct-to-Metal Coating
For machinery and equipment enquiries where a direct-to-metal route is being considered.
AcrDTM D212L · Direct-to-metal coating
Key specifications
| Product role | Direct-to-metal coating |
|---|---|
| Chemistry | Zinc phosphate-modified aliphatic polyurethane |
| Components | Two components (2K) |
| Dry film thickness | 60–80 µm per coat. |
| Theoretical coverage | 8.1–10.8 m²/L at the stated DFT, before thinning and site losses. |
| Mix ratio A:B | 7:1 by weight |
| Colour | Standard / RAL on request |
| Finish | Gloss ≥80 GU at 60° |
| Volume solids | 65.0% by volume (63.0%–67.0%) |
| Mass solids | 78.0% by weight (76.0%–80.0%) |
| Density | 1.340 kg/L at 25 °C, mixed A+B before thinning |
Additional engineering and product references
- VOC content
- <420 g/L
- Wet film thickness
- 92–123 µm per coat before thinning.
TDS & SDS
TDS Technical data sheet
A Component SDS
B Component SDS
Coating system
Use the complete AcrDTM D212L model name. Ask for the current formula and confirm preparation and whether a primer is required.
- Not a substitute for zinc-rich primer where required. Do not assume a single coat is suitable for demanding exposure.
For structural steel: compare atmospheric exposure categories C1–C5
Substrate preparation
Confirm the exact metal and existing surface condition. Check where direct application is permitted, what preparation is specified, and whether the proposed exposure needs more than one coat or a different build-up.
For structural steel, use these checks:
Application reference
| Application method | Mainly spray application |
|---|---|
| Application temperature | 5–35 °C |
| Relative humidity | ≤85% |
| Mix ratio A:B | 7:1 by weight |
| Pot life | Engineering working time: maximum 2 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first. |
| Touch dry | 1 h at 25 °C and 50% RH under the adopted engineering application condition. |
| Dry to handle | Allow 9 h at 25 °C and 50% RH before handling. |
| Recoat interval | 8–72 h at 25 °C and 50% RH; clean and abrade after the maximum. |
| Full cure | 7 days at 25 °C and 50% RH. |
| Thinner | UreThi 10 |
| Thinning reference | Use UreThi 10, 0–10% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C. |
Packaging & ordering
| Packaging | Use the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label. |
|---|---|
| Matched component set | A 14 kg + B 2 kg / 16 kg set |
| Shelf life | 12 months in unopened original containers under the stated storage conditions |
Include the quantity, delivery country and colour reference in your enquiry.
LET’S TALK MATERIALS
Your project.
A clearer next step.
Tell us what you know. Leave the technical unknowns to the conversation.
JavaScript is required to send your enquiry.
