Industrial floor coatings
FloPri WB31 Water-based epoxy primer and binder
Prime a cementitious floor or use as a binder for a specified mortar or putty.
FloPri WB31 · Primer / intermediate binder
- Illustrative primer scenario; dual primer/intermediate role
- FloPri WB31 · Primer
Key specifications
| Product role | Primer / intermediate binder |
|---|---|
| Chemistry | Water-based epoxy |
| Components | Two components (2K) |
| Mixed density | 1.100 kg/L at 25 °C, mixed A+B before thinning |
| Mass solids | 70.0% by weight |
| Volume solids | 68.0% by volume |
| VOC content | <400 g/L |
| Dry film thickness | Mortar: maximum 0.50 mm per pass. Putty: 0.20–0.25 mm per pass. Primer: control by consumption and absorption. |
| Suitable substrate / previous layer | Prepared cementitious substrate |
| Consumption | Not displayed; confirm the applicable manufacturer specification. |
TDS & SDS
TDS Technical data sheet
A Component SDS
B Component SDS
Technical source and application limits
View document availabilityCoating system
| Recommended coating system | Prepared concrete; FloPri WB31 primer; WB31 mortar or putty if needed; specified FloTop wearing coat. |
|---|
Substrate preparation
Verify the substrate condition, moisture and previous coating where present. Follow the preparation instructions for the specified system.
Application reference
| Mix ratio (A:B) | 1:1 by weight |
|---|---|
| Site batching by weight | Ratios by weight. Primer A:B:water = 1:1:1–1.5. Mortar A:B:water:dry quartz powder:dry quartz sand = 1:1:3:3:7. Putty A:B:water:dry quartz powder = 1:1:3:4. |
| Touch dry | Approx. 4 h at 25 °C |
| Recoat interval | Primer: 24–72 h. Mortar and putty: 48–72 h per pass. Conditions: 25 ± 2 °C, RH ≤70%, effective ventilation and through-dry acceptance. Use the stated minimum waits at other permitted temperatures and extend them until the acceptance checks pass; mechanically prepare surfaces whenever the 72 h interval is exceeded. |
| Ambient temperature | 15–30 °C for material, air and substrate. The stated 25 °C application schedule applies at 25 ± 2 °C. |
| Substrate temperature | 15–30 °C; maintain at least 3 °C above dew point during application and drying. |
| Dedicated hardener | FloPri WB31 Part B. Use the matched kit at the stated product-specific A:B weight ratio. |
Packaging & ordering
| Component packaging | Part A: 20 kg; Part B: 20 kg |
|---|---|
| Complete pack | 40 kg per set |
| Shelf life | 12 months in unopened original packs. |
| Storage temperature | 5–30 °C; dry, sealed, protected from sunlight; protect from freezing. |
LET’S TALK MATERIALS
Your project.
A clearer next step.
Tell us what you know. Leave the technical unknowns to the conversation.
JavaScript is required to send your enquiry.
