Jinlang Chemical — Metal’s Trusted Shield

Industrial floor coatings

FloPri WB31 Water-based epoxy primer and binder

Prime a cementitious floor or use as a binder for a specified mortar or putty.

FloPri WB31 · Primer / intermediate binder

FloPri WB31Primer
  • Illustrative primer scenario; dual primer/intermediate role
  • FloPri WB31 · Primer

Key specifications

Product rolePrimer / intermediate binder
ChemistryWater-based epoxy
ComponentsTwo components (2K)
Mixed density1.100 kg/L at 25 °C, mixed A+B before thinning
Mass solids70.0% by weight
Volume solids68.0% by volume
VOC content<400 g/L
Dry film thicknessMortar: maximum 0.50 mm per pass. Putty: 0.20–0.25 mm per pass. Primer: control by consumption and absorption.
Suitable substrate / previous layerPrepared cementitious substrate
ConsumptionNot displayed; confirm the applicable manufacturer specification.

TDS & SDS

TDS Technical data sheet

A Component SDS

B Component SDS

Technical source and application limitsView document availability

TDS and SDS: which document do you need?

Coating system

Recommended coating systemPrepared concrete; FloPri WB31 primer; WB31 mortar or putty if needed; specified FloTop wearing coat.

What the floor primer does

Compare floor coatings

Substrate preparation

Verify the substrate condition, moisture and previous coating where present. Follow the preparation instructions for the specified system.

Inspect the cementitious substrate

Find out why the floor stays damp

Application reference

Mix ratio (A:B)1:1 by weight
Site batching by weightRatios by weight. Primer A:B:water = 1:1:1–1.5. Mortar A:B:water:dry quartz powder:dry quartz sand = 1:1:3:3:7. Putty A:B:water:dry quartz powder = 1:1:3:4.
Touch dryApprox. 4 h at 25 °C
Recoat intervalPrimer: 24–72 h. Mortar and putty: 48–72 h per pass. Conditions: 25 ± 2 °C, RH ≤70%, effective ventilation and through-dry acceptance. Use the stated minimum waits at other permitted temperatures and extend them until the acceptance checks pass; mechanically prepare surfaces whenever the 72 h interval is exceeded.
Ambient temperature15–30 °C for material, air and substrate. The stated 25 °C application schedule applies at 25 ± 2 °C.
Substrate temperature15–30 °C; maintain at least 3 °C above dew point during application and drying.
Dedicated hardenerFloPri WB31 Part B. Use the matched kit at the stated product-specific A:B weight ratio.

Packaging & ordering

Component packagingPart A: 20 kg; Part B: 20 kg
Complete pack40 kg per set
Shelf life12 months in unopened original packs.
Storage temperature5–30 °C; dry, sealed, protected from sunlight; protect from freezing.

LET’S TALK MATERIALS

Your project.
A clearer next step.

Tell us what you know. Leave the technical unknowns to the conversation.

JavaScript is required to send your enquiry.

Your enquiry details
Choose a RAL Colour opens the colour guide in this tab. When browsing options with arrow keys, press Enter to confirm.Choose a RAL Colour

For kg-based products, leave Package blank and enter the number of sets in Quantity.