An industrial floor coating system is selected around the condition of the concrete, traffic and loading, liquid exposure, cleaning routine and the required surface finish. Roller-applied coatings provide a thin protective surface, self-levelling systems create a smooth continuous finish, and aggregate-broadcast systems offer different surface textures. The primer, build coat and finish each perform a specific function, with the complete layer schedule determining the system's intended use and material requirements.

Compare common industrial floor system types

System type Typical project requirement Substrate and layer considerations Surface and consumption basis
Roller-applied thin-film coating Surface protection and colour on a sound, suitably even floor Prepared concrete, suitable primer and specified finish coats Smooth or lightly textured appearance; consumption per coat
Smooth self-levelling coating Continuous, cleanable surface with a specified finish thickness Repaired and prepared concrete, primer, any required build layer and self-levelling finish Smooth continuous surface; finish thickness and kg/m² per specified build
Aggregate-broadcast system A defined surface texture for the intended operating conditions Primer, compatible resin and aggregate, with a specified sealing or finishing arrangement Textured appearance; resin and aggregate quantities recorded separately
Roller-applied thin film: fine surface texture.
Roller-applied thin film: fine surface texture.
Self-levelling finish: smooth, continuous surface.
Self-levelling finish: smooth, continuous surface.
Sealed aggregate-broadcast finish: visible granular texture.
Sealed aggregate-broadcast finish: visible granular texture.

A warehouse may prioritise vehicle traffic and ease of cleaning. A wet-process area may require a defined wet slip-resistance performance and a surface suitable for its cleaning and chemical exposure. A production area may also need specific mechanical or chemical resistance. Select the complete system using these operating requirements and documented performance data.

Understand the role of each layer

Successive stages: concrete, primer, build coat and finish.
Successive stages: concrete, primer, build coat and finish.

Primer: A compatible primer wets the prepared concrete, promotes adhesion and helps regulate surface absorption. Select it according to the substrate condition, preparation and moisture requirements. Where a project needs moisture control, specify the dedicated system and its applicable substrate conditions.

Build coat or resin mortar: An intermediate layer can fill surface pores, improve evenness and achieve the specified system build. Resin mortar can provide additional build where the design calls for it. Define the binder, aggregate, layer thickness and mixing requirements separately. Structural concrete and joint repairs form their own work scope.

Finish coat: The wearing surface provides the final colour, texture, gloss and other exposed properties. Select the finish and complete system for the expected abrasion, slip-resistance requirements, cleaning and chemical contact. Decorative quartz and aggregate finishes use the specified resin and sealing arrangement to achieve the desired appearance and texture.

Read thickness and consumption correctly

Three measurements commonly appear in industrial flooring quotations:

Measurement Meaning Where it is used
Total system thickness Combined installed thickness of the specified floor layers Comparing complete build-ups
Individual layer thickness Thickness attributed to a specific cured layer Selecting and estimating the material for that layer
Trowel tooth height Dimension of an application tool Describing the application method

An installation schedule should identify the measurement basis used for each value. One millimetre equals 1,000 micrometres (µm). Thin film coatings are often specified in micrometres or by coverage per coat; thicker resin layers may use millimetres and consumption in kilograms per square metre.

For a thickness-based material estimate, multiply the area by the specified consumption per unit thickness and the target thickness. As a purely illustrative calculation, a material consuming 1.5 kg/m² per mm would require 1,200 kg for an 800 m² finish layer at 1 mm, before practical allowances. The selected product's own consumption rate determines the project quantity. Record resin and any separately added aggregate as separate material items.

Review a complete floor layer schedule

Work or layer Product or method Quantity basis Thickness and conditions
Substrate preparation and repairs Defined mechanical method and repair materials Area, length or repair volume Specified surface condition
Primer Selected compatible primer kg/m² or L/m² Coat count, absorption and recoat window
Build coat or mortar, where specified Selected binder and aggregate Binder and aggregate quantities Specified layer build and application method
Finish Selected finish product kg/m² or L/m² Coat count, cured thickness and texture
Optional sealing or additional finish Specified compatible material Consumption per coat Required surface properties and recoat window

Review each layer alongside its associated product documents. The complete system schedule also describes the return-to-service conditions for pedestrian traffic, vehicles, cleaning and chemical exposure.

For an existing floor, begin with the industrial floor renovation guide to identify the preparation and repair scope. Use the TDS and SDS document checklist when preparing the material order.

Share the floor area, intended use and surface requirements with Jinlang to discuss a suitable primer, build coat and finish arrangement.

Request a Floor System Specification