An industrial floor renovation starts with a survey of the existing surface. Identify damaged zones, record moisture and contamination, and assess the condition of the old coating and concrete. Then define future traffic, cleaning requirements and the dates on which each area needs to reopen. These details establish the scope of preparation, repairs and new coating layers, giving contractors and coating suppliers a consistent basis for material estimates and renovation quotations.

Map the existing floor and its defects
Use a floor plan or a simple sketch to divide the facility into zones. Mark production areas, aisles, loading points, wet rooms and other areas with different operating conditions. Give each zone an identification number and record its approximate area.
Identify the current surface: bare concrete, epoxy, polyurethane, tiles or another existing finish. Previous product records, installation dates and repair history help establish the condition of the system. Where the original coating identity is unknown, record it as unknown and retain a sample or test area where useful.
| Site finding | Investigation to arrange | Work item to include in the quote |
|---|---|---|
| Worn vehicle lanes or exposed concrete | Extent and depth of wear; adjacent coating condition | Mechanical preparation and reinstatement of coating layers |
| Peeling or blisters | Adhesion, concrete condition and potential moisture or contamination | Removal of affected coating and associated preparation |
| Cracks and damaged joints | Location, width, movement and surrounding concrete | Defined crack and joint treatment |
| Oil or process contamination | Area, contaminant identity and penetration | Cleaning, decontamination and surface preparation |
| Uneven or damaged concrete | Level differences, surface strength and repair depth | Local repair or levelling work |
| Damp areas | Moisture measurements and potential sources of water | Moisture-related preparation or a suitable moisture-control system, where needed |

Photograph each marked location and attach the corresponding inspection record. An overall photograph establishes the extent of the work; closer views show the individual defects.
Decide which existing coating areas to retain or remove
Three scopes are common in renovation projects: retain and prepare sound coating, remove damaged areas locally, or remove the existing system across the entire working zone.
A retained coating needs suitable adhesion, surface condition and compatibility with the proposed new layers. Where the coating identity or condition is uncertain, use agreed inspection methods and a representative trial area. Record the preparation and the observed performance of the trial.
For adhesion assessment on coated concrete, ASTM D7234 provides a pull-off test method. Record the measured strength, test equipment and failure location: within the concrete, within a coating layer, at an interface or within the test assembly. These details help establish the appropriate removal and repair scope.
Select diamond grinding, shot blasting or another suitable preparation method according to the existing surface and the required concrete profile. Include treatment at the boundaries between retained and removed coating.
Record moisture and contamination findings
Moisture readings are most useful when the report identifies the method, units, measurement location and date. In-situ relative humidity measurements and other applicable moisture assessment methods have distinct measurement bases. Use the limits associated with the selected flooring system and test method.
Investigate wet or damp areas alongside the site's drainage, water exposure and concrete construction. Where the project requires a moisture-control system, include that system as a separate item in the proposed build-up.
Record oils, cleaning chemicals and process fluids that have contacted the floor. These details guide decontamination work, preparation and the compatibility assessment for new coatings.
Compare material quantities and renovation work
| Quotation item | Details to compare |
|---|---|
| Survey and testing | Included tests, number of locations and inspection records |
| Preparation and removal | Area, preparation method, retained areas and removal scope |
| Concrete and joint repairs | Repair type, dimensions and quantities |
| Coating materials | Product codes, layer functions, coat count and thickness per layer |
| Material estimate | Net theoretical quantity, practical consumption, allowances and packaging |
| Installation | Application method, work zones, access, labour and waste handling |
| Programme | Shutdown duration and use-specific reopening milestones |
Review the industrial floor coating system guide for primer, build coat, finish and thickness definitions. Request the material estimate in kilograms or litres with a consistent basis for the area and layer thickness. Concrete texture, absorption and application losses inform the practical allowance.
Plan curing and return to service
A renovation programme has two distinct parts: the working time of the coating materials and the release of the finished floor for different uses. Record these milestones using the selected product and system data at the expected site conditions.
| Application milestone | Timing reference | Value to record |
|---|---|---|
| Pot life (for mixed 2K material) | Start of mixing or product-defined timing point | Working time, material temperature and batch size |
| Recoat window | Application of the preceding coat | Minimum and maximum intervals at recorded conditions |
| Service milestone | Timing reference | Release condition to record |
|---|---|---|
| Pedestrian access | Completion of the final coat | Time and conditions for foot traffic |
| Forklift and pallet-truck traffic | Completion of the final coat | Time for the specified vehicle and wheel loading |
| Static loads and equipment | Completion of the final coat | Time for the intended load and installation work |
| Wet cleaning and chemical contact | Completion of the final coat | Time and conditions for the intended cleaning or chemical exposure |
For phased renovations, prepare a schedule for each zone, including access routes during installation. Once the floor is released for its intended use, establish the routine described in the floor cleaning and maintenance guide.
Floor renovation enquiry template
Use the following information to prepare a quotation request:
- Facility type, country and total area (m²):
- Zone references and existing finish:
- Observed defects and affected areas:
- Moisture, adhesion and contamination records:
- Future traffic, loads and chemical exposure:
- Preferred appearance and surface texture:
- Available work window and required reopening dates:
- Attached drawings and site photographs:
Ask for a zone-by-zone preparation and repair scope, material schedule, estimated quantities and application programme. The coating TDS and SDS checklist explains which documents accompany the proposed products.
Submit a Floor Renovation Survey