Jinlang Chemical — Metal’s Trusted Shield

Industrial floor coatings

FloMor SB10 Economy epoxy intermediate coating

Use as an epoxy build coat; confirm the intended build and adjoining coats.

FloMor SB10 · Intermediate coat

FloMor SB10Intermediate coat
  • FloMor SB10 · Intermediate coat

Key specifications

Product roleIntermediate coat
ChemistrySolvent-based epoxy
ComponentsTwo components (2K)
Build thicknessTotal cured layer: 0.50–1.50 mm. At A+B:quartz = 1:1, maximum 0.30 mm per pass; at 1:0.5, maximum 0.25 mm.
Mixed density1.450 kg/L at 25 °C, mixed A+B before thinning
Mass solids87.4% by weight (86.4%–88.4%)
Volume solids79.1% by volume (77.8%–80.4%)
VOC content<400 g/L
Suitable substrate / previous layerConfirm substrate and adjoining coats
ConsumptionNot displayed; confirm the applicable manufacturer specification.

TDS & SDS

TDS Technical data sheet

A Component SDS

B Component SDS

TDS and SDS: which document do you need?

Coating system

Recommended coating systemFloPri SB10/SB11 or compatible WB31; FloMor SB10; compatible FloTop finish; select based on substrate and build.

Compare the listed role of FloPri SB10

What a floor build coat does

Compare floor coatings

Substrate preparation

Verify the substrate condition, moisture and previous coating where present. Follow the preparation instructions for the specified system.

Inspect defects before specifying the intermediate layer

Application reference

Mix ratio (A:B)5:1 by weight
Pot lifeApprox. 40 min at 25 °C
Touch dryApprox. 4 h at 25 °C
Full cureApprox. 7 days at 25 °C
Recoat intervalMortar to mortar: 24–48 h per pass. Mortar to the final wearing coat: minimum 48 h after the last pass; abrade and vacuum clean at this interface. Schedule applies at 25 ± 2 °C and RH ≤70% with effective ventilation. Extend waiting until through-dry acceptance is achieved.
Ambient temperature10–35 °C
Substrate temperature10–35 °C
Thinning / dilutionApply mixed A+B with the specified dry quartz. Additional solvent: 0%.
Dedicated hardenerFloMor SB10 Part B. Use the matched kit at the stated product-specific A:B weight ratio.

Packaging & ordering

Component packagingPart A: 25 kg; Part B: 5 kg
Complete pack30 kg per set
Shelf life12 months in unopened original packs.
Storage temperature5–30 °C; dry, sealed, protected from sunlight; keep away from ignition sources.

LET’S TALK MATERIALS

Your project.
A clearer next step.

Tell us what you know. Leave the technical unknowns to the conversation.

JavaScript is required to send your enquiry.

Your enquiry details
Choose a RAL Colour opens the colour guide in this tab. When browsing options with arrow keys, press Enter to confirm.Choose a RAL Colour

For kg-based products, leave Package blank and enter the number of sets in Quantity.