EpoPri D22 Surface-Tolerant Epoxy Primer
Maintenance steelwork and machinery projects where the planned surface preparation is a key selection question.
EpoPri D22 · Primer layer
- Finish coat
- Intermediate coat
- EpoPri D22 · Primer
- Prepared steel plate
Key specifications
| Product role | Surface-tolerant primer |
|---|---|
| Chemistry | Epoxy |
| Components | Two components (2K) |
| Dry film thickness | 50–80 µm per coat. |
| Theoretical coverage | 8.5–13.6 m²/L at the stated DFT, before thinning and site losses. |
| Mix ratio A:B | 9:1 by weight |
| Colour | Standard / RAL on request |
| Volume solids | 68.0% by volume (66.0%–70.0%) |
| Mass solids | 81.0% by weight (79.0%–83.0%) |
| Density | 1.450 kg/L at 25 °C, mixed A+B before thinning |
Additional engineering and product references
- VOC content
- <420 g/L
- Wet film thickness
- 74–118 µm per coat before thinning.
TDS & SDS
TDS Technical data sheet
A Component SDS
B Component SDS
Coating system
D22 is described as a surface-tolerant primer. This does not remove the need for preparation or establish compatibility with an existing coating; confirm the current D22 specification.
- Surface tolerant does not mean preparation-free. Confirm the profile and preparation for new or previously coated steel.
Surface preparation for maintenance
Remove loose rust and unsound paint. Check the adhesion of retained paint and prepare the steel before applying D22.
For structural steel: compare atmospheric exposure categories C1–C5
Substrate preparation
Identify the substrate and whether it is bare, shop-primed or previously coated. Record rust, contamination and the condition of any existing paint. Confirm the preparation for this primer and the specified substrate before application.
For structural steel, use these checks:
Application reference
| Application method | Airless spray / conventional spray / brush |
|---|---|
| Application temperature | 5–35 °C |
| Relative humidity | ≤85% |
| Mix ratio A:B | 9:1 by weight |
| Pot life | Engineering working time: maximum 4 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first. |
| Touch dry | ≤3 h at 25 °C |
| Hard dry | 12 h at 25 °C |
| Recoat interval | 12 h–7 days at 25 °C; after maximum, clean and abrade before recoating. |
| Full cure | 7 days at 25 °C |
| Thinner | EpoThi 10 |
| Thinning reference | Use EpoThi 10, 0–10% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C. |
Packaging & ordering
| Packaging | Use the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label. |
|---|---|
| Matched component set | A 18 kg + B 2 kg / 20 kg set |
| Shelf life | 6 months |
Include the quantity, delivery country and colour reference in your enquiry.