Jinlang Chemical — Metal’s Trusted Shield

Metal protective coatings

EpoPri D22 Surface-Tolerant Epoxy Primer

Maintenance steelwork and machinery projects where the planned surface preparation is a key selection question.

EpoPri D22 · Primer layer

Finish coatIntermediate coatEpoPri D22PrimerPrepared steel plate
  • Finish coat
  • Intermediate coat
  • EpoPri D22 · Primer
  • Prepared steel plate

Key specifications

Product roleSurface-tolerant primer
ChemistryEpoxy
ComponentsTwo components (2K)
Dry film thickness50–80 µm per coat.
Theoretical coverage8.5–13.6 m²/L at the stated DFT, before thinning and site losses.
Mix ratio A:B9:1 by weight
ColourStandard / RAL on request
Volume solids68.0% by volume (66.0%–70.0%)
Mass solids81.0% by weight (79.0%–83.0%)
Density1.450 kg/L at 25 °C, mixed A+B before thinning
Additional engineering and product references
VOC content
<420 g/L
Wet film thickness
74–118 µm per coat before thinning.

TDS & SDS

TDS Technical data sheet

A Component SDS

B Component SDS

Coating system

D22 is described as a surface-tolerant primer. This does not remove the need for preparation or establish compatibility with an existing coating; confirm the current D22 specification.

  • Surface tolerant does not mean preparation-free. Confirm the profile and preparation for new or previously coated steel.

Surface preparation for maintenance

Remove loose rust and unsound paint. Check the adhesion of retained paint and prepare the steel before applying D22.

What a steel primer does

For structural steel: compare atmospheric exposure categories C1–C5

Substrate preparation

Identify the substrate and whether it is bare, shop-primed or previously coated. Record rust, contamination and the condition of any existing paint. Confirm the preparation for this primer and the specified substrate before application.

For structural steel, use these checks:

Application reference

EpoPri D22 application values
Application methodAirless spray / conventional spray / brush
Application temperature5–35 °C
Relative humidity≤85%
Mix ratio A:B9:1 by weight
Pot lifeEngineering working time: maximum 4 h at 25 °C. Start timing when A and B are first combined; induction and application are included. Discard material when this time expires or when application viscosity rises, whichever occurs first.
Touch dry≤3 h at 25 °C
Hard dry12 h at 25 °C
Recoat interval12 h–7 days at 25 °C; after maximum, clean and abrade before recoating.
Full cure7 days at 25 °C
ThinnerEpoThi 10
Thinning referenceUse EpoThi 10, 0–10% by volume of the mixed coating, for all permitted methods. Thinner supply density: ≤1.00 kg/L at 25 °C.

Packaging & ordering

EpoPri D22 packaging options
PackagingUse the product-specific matched kit listed under Component packaging. Identify the net mass of each component on its label.
Matched component setA 18 kg + B 2 kg / 20 kg set
Shelf life6 months

Include the quantity, delivery country and colour reference in your enquiry.

LET’S TALK MATERIALS

Your project.
A clearer next step.

Tell us what you know. Leave the technical unknowns to the conversation.

JavaScript is required to send your enquiry.

Your enquiry details
Choose a RAL Colour opens the colour guide in this tab. When browsing options with arrow keys, press Enter to confirm.Choose a RAL Colour

For kg-based products, leave Package blank and enter the number of sets in Quantity.