For a dry area with sound concrete and light traffic, start by comparing thin-film epoxy coatings. For a smoother, more uniform finish in production areas, look at self-levelling epoxy flooring. Where ramps or walkways regularly get wet, consider a quartz-broadcast epoxy system and check slip-resistance data for the finished system under the conditions you expect.

A single facility may need all three. A dry stockroom, a forklift turning lane and a wet entrance have different jobs to do, even if you want the same colour throughout.

Three grey epoxy floor finishes: roller-applied thin film, smooth self-levelling epoxy and textured quartz broadcast

Finish comparison, left to right: thin-film, self-levelling and quartz-broadcast epoxy.

Compare the three epoxy floor systems

System Where to start What the finish does What to check before ordering
Thin-film epoxy Dry stockrooms, utility areas and sound floors with light traffic A roller-applied film gives the slab a uniform colour but largely follows its existing profile Slab repairs, actual wheel traffic and the required coat build
Self-levelling epoxy Dry production or assembly areas where a smooth, seamless finish and easy cleaning matter A flow-applied wearing layer smooths minor surface texture on a prepared base Flatness, floor falls, concentrated loads and time before reopening
Quartz-broadcast epoxy Wet approaches, pedestrian crossings and ramps where surface grip is a priority Graded aggregate and a compatible seal coat create a textured wearing surface Slip-test method and conditions, final texture, drainage and cleaning equipment

These are starting points for shortlisting. FeRFA’s resin flooring classification separates systems by build and finish; ask your supplier to quote the total installed thickness and each layer, so competing quotes describe comparable work.

When thin-film epoxy makes sense

A roller-applied coating is a good starting point when the concrete is already sound and reasonably even, and the buyer mainly wants a cleanable, coloured surface. Typical candidates include dry utility rooms and light-duty stock areas. Tool marks, filled patches and shallow waves can still show through. If the room has forklift traffic, tell the supplier what wheels are used and where vehicles turn, brake or load. A straight aisle and a turning bay can wear very differently.

Ask the supplier for: the primer and number of coats, practical coverage on the prepared slab, and the time before foot or vehicle traffic can return.

When to choose self-levelling epoxy

Choose a flow-applied system when the finished floor needs to be smooth and uniform enough for your cleaning routine or production process. The coating flows over a prepared surface and evens out minor texture. Price deeper repairs and correction of slab levels separately, and identify any existing falls to drains that must be preserved.

A smooth finish is easier to wipe or scrub than a coarse finish, but that alone does not make it suitable for a wet route. Separate wet zones from dry zones on the project drawing instead of specifying one finish throughout.

Ask the supplier for: the wearing-layer thickness, layer build, finish sample, and the times for foot traffic and full service at the expected site temperature.

When to choose quartz-broadcast epoxy

A typical broadcast build uses a resin layer, graded aggregate spread onto the wet resin, and a seal coat after loose aggregate is removed. Aggregate grading and the amount of seal coat both affect the final texture. A sealed sample is therefore more useful than a handful of dry quartz when comparing finishes.

For areas exposed to water or oil, ask for the test method and results for the actual finished build under relevant conditions. Then trial the finish with the cleaning equipment the site will use. The goal is a texture that meets the site’s grip requirement and can still be kept clean. The UK Health and Safety Executive’s flooring guide explains how test conditions, contaminants and surface roughness affect how results are interpreted.

Ask the supplier for: the aggregate grading, seal coat, slip-resistance data for the quoted finish, and the recommended cleaning method.

Check the slab before comparing prices

For any of the three systems, walk the slab first. Mark damaged concrete, moving joints, old coatings, oil contamination and areas where moisture is suspected. Ask how the concrete will be mechanically prepared and which moisture test and acceptance limit apply to the proposed build. Put repairs and preparation in the quote as separate lines, so a lower coating price does not conceal missing work. The International Concrete Repair Institute’s preparation guidance explains how substrate condition and the proposed material affect the choice of surface preparation.

For example, on a warehouse refurbishment, mark the wet loading entrance separately from the dry pick aisles. Include the forklift turning bay as its own zone. That gives suppliers a reason to quote a different build where wear or grip demands it, instead of pricing every square metre to the toughest condition.

What to send for a flooring quote

Send one marked-up floor plan or a few labelled photos. For each zone, include:

  1. Area and use: square metres, foot traffic, forklifts or vehicle traffic, and turning or loading points.
  2. Concrete condition: new or existing slab, old coatings, cracks, patches and any moisture-test results.
  3. Exposure: water, oil or chemical spills, cleaning method and any specified slip-resistance requirement.
  4. Project timing: the shutdown window and when the area must reopen to traffic.